Construction Data: What to Review This Spring

construction data

Construction data included in building permits changes with the seasons. Projects encountered in autumn, for example, are generally not the same as what’s happening in spring and early summer. Contractors and subcontractors can benefit from targeting their focus to fit the time of year.

Spring is the season for home improvements and remodeling. As the weather improves, houses open up and homeowners tend to start planning updates. Among the most popular are:

  • Kitchen renovation. Kitchen revamps typically appear in building permits as electrical alterations to accommodate the new appliances as well as replacement/expansion of kitchen plumbing. Cosmetic changes like installing new counters or cabinets, conversely, generally don’t require building permits in most locales.
  • Room additions. Adding a new room to a home or converting a garage is often not feasible during winter. As spring arrives, however, permit data shows that room additions spike. In addition to the general construction permit, there will be increases for specialty trades including electrical, HVAC, and plumbing.
  • Roofing repairs. That leaky or snow-damaged roof homeowners put up with all winter requires a permanent fix now that the weather’s improving. Any roofing work more complex than a simple single patch shows up in building permit data, including new shingles and subroof repair.  
  • Window replacement. Cold drafts and heat loss due to aging single-pane windows have taken their toll this winter. As summer approaches, the installation of new energy-efficient windows is often on the agenda. Because installing dual-pane energy-efficient windows usually involves alterations to the window opening or other structural changes, it requires a permit.
  • HVAC and associated work. Residents ready to upgrade a central air conditioner or furnace often put it off until outdoor temperatures moderate in spring. Replacement of a central A/C or furnace—or associated work such as replacing or extending HVAC ductwork—requires permitting and appears in building permit data for that locale.

Reviewing construction data for season-specific projects helps keep work and profits consistent as the calendar changes. Contact Construction Monitor for more details.

1 thought on “Construction Data: What to Review This Spring”

  1. Pingback: New Homes Being Built: 3 Things You Can Learn – Construction Monitor

Leave a Comment

Your email address will not be published. Required fields are marked *